Oil immersed transformers are widely used in power distribution, industrial plants, renewable energy and infrastructure projects for their stable performance and strong overload capacity. Even well-built transformers may develop faults after years of running under harsh outdoor or heavy-load conditions. Early fault detection and standardized maintenance can greatly extend service life, reduce unplanned downtime and avoid costly power accidents. As a professional China transformer manufacturer, Xinhong Electrical shares typical oil immersed transformer faults and practical maintenance tips for engineers, contractors and asset managers.

Common Faults of Oil Immersed Transformer

1. Oil Leakage & Oil Deterioration

Oil leakage ranks among the most frequent field faults. It usually occurs at rubber gaskets, welding seams, valve joints and bushing bases. Long-time temperature cycling, aging seals, vibration and improper installation are the main triggers.

When transformer oil deteriorates, moisture, acid and sludge build up inside the tank. The oil loses insulation and heat dissipation ability. Signs include dark oil color, increased acidity, lower breakdown voltage and gas generation detected by DGA (Dissolved Gas Analysis). Moisture ingress is often caused by damaged breathers or poor sealing.

2. Winding Faults

Winding faults are high-risk internal failures, mainly including inter-turn short circuit, winding-to-ground fault and winding deformation. Insulation paper aging, mechanical impact from short-circuit current, moisture contamination and manufacturing defects are typical causes.

Minor inter-turn short circuits create local hot spots and produce combustible gas. Without timely intervention, it may progress into severe burnout. Winding deformation usually happens after large short-circuit impact, which damages insulation structure and reduces mechanical strength. Xinhong Electrical uses pure copper windings for our oil immersed transformers to improve short-circuit resistance and long-term reliability.

3. Iron Core Faults

The transformer iron core must maintain single-point grounding in normal operation. Multi-point grounding will form circulating current and lead to local overheating, oil decomposition and abnormal loss rise. Another core fault is inter-laminar short circuit due to damaged insulation between silicon steel sheets, which increases no-load loss and hot spots.

4. Bushing Faults

Bushings work as insulation and lead-out components. Surface pollution, humidity, salt spray, cracks and aging can cause flashover or internal insulation breakdown. In coastal or dusty regions, contamination on porcelain surfaces easily triggers discharge. Cracked bushings also bring risk of water leakage into the transformer tank.

5. Tap Changer & Cooling System Failures

On-load or off-load tap changers suffer poor contact, mechanical jamming and oil cross-contamination after frequent operation. Bad contact creates hot spots and abnormal gas signals.

Cooling system faults include blocked radiators, failed cooling fans and oil pump malfunctions. Dust, sand and dirt block radiator fins and reduce heat dissipation. Continuous overheating accelerates insulation aging and cuts transformer lifespan sharply.

Practical Maintenance Tips for Oil Immersed Transformer

1. Regular Oil Inspection & DGA Testing

Transformer oil serves as both insulation medium and heat transfer medium. Carry out routine sampling and testing. Key testing items: dielectric strength, moisture content, acidity, interfacial tension and dissolved gas analysis (DGA). DGA can capture early hidden faults such as overheating, partial discharge and arcing before visible failure appears. Filter or regenerate degraded oil; replace oil when indicators exceed limits.

2. Visual & External Inspection

Check oil level, oil leakage, breather silica gel, bushing surface, radiator and connecting terminals every month. Replace expired silica gel once it turns pink. Clean dust, salt and dirt on bushings and radiators periodically, especially for units installed in desert, coastal and heavily polluted areas. Check earthing connection and tighten loose terminals.

3. Protection Device Calibration

Inspect gas relay (Buchholz relay), temperature relay, pressure relief valve and protection circuit regularly. Verify trip and alarm functions. Protection relays are critical safety barriers to cut power once internal faults occur.

4. Load & Temperature Monitoring

Keep continuous monitoring of load current and top oil temperature. Avoid long-term overload operation. If temperature rises abnormally, reduce load immediately and check cooling system and internal conditions. Match transformer capacity with actual project load during design stage.

5. Periodic Electrical Tests During Outage

During scheduled power outages, run insulation resistance test, DC resistance test, transformation ratio test and partial discharge check. These tests help find hidden winding and core defects. Complete comprehensive overhaul for transformers reaching the designed service cycle.

Why Choose Xinhong Electrical Oil Immersed Transformers

Xinhong Electrical is a China transformer manufacturer with 15 years of production experience. Our factory covers 27,000 ㎡, supplying oil immersed transformers, dry transformer china and box-type substations from 100kVA to 25MVA up to 35kV. All products pass ISO, CE and CB certifications. We adopt pure copper windings, full-sealed tank structure and strict factory testing to minimize field failure risks.

We support customized technical parameters for power grid, mining, construction, solar and overseas power projects. Besides equipment supply, our technical team also provides operation guidance, fault diagnosis and after-sales support for global customers.

FAQ

Q1: How often should I test transformer oil?

A: For transformers under normal working conditions, annual oil sampling and DGA test is recommended. For heavy-load, coastal or high-temperature environments, test every 6 months.

Q2: What is the main sign of multi-point grounding on transformer core?

A: Rising no-load loss, local overheating, gas production and abnormal grounding current. You need power shutdown and core inspection once confirmed.

Q3: Can Xinhong Electrical supply dry transformer and oil immersed transformer together for one project?

A: Yes. Xinhong Electrical manufactures both dry transformer china and oil immersed transformers, we offer one-stop power transformer solutions for worldwide projects.

Conclusion

Oil immersed transformer faults mostly come from insulation aging, oil degradation, sealing failure and insufficient routine maintenance. A complete preventive maintenance plan reduces emergency shutdown risks significantly. If you need reliable oil immersed transformers or dry transformer china from China, contact Xinhong Electrical for technical consultation and quotation.